14 Items in Thermal Insulation Application

  • Ana Sayfa
  • Blog
  • How to Apply Thermal İnsulation in 14 Articles?

How to Apply Thermal İnsulation in 14 Articles?

  • Metpor

    Metpor

    info@metpordekor.com

    Okunma Sayısı : 185

How to Apply Thermal İnsulation in 14 Articles?

    How to Apply Sheathing in 14 Articles?

    1. Surface Preparation for Sheathing Application
    2. Basement Profile Placement
    3. Adhesive Metpor Thermal Insulation Boards
    4. Metpor Thermal Insulation Boards Doweling
    5. Metpor Corner Profiles Placement
    6. Metpor Mesh Plaster Application
    7. Metpor Decorative Coating and Exterior Paint
    8. The application surface is cleaned from dust, dirt, oil and moisture. Spilled or swelled areas are cleaned with a wire brush, cracked and broken areas are repaired with filling materials.
    9. It is ensured that the heat insulation boards to be used are placed on the subbasement profile to form a smooth line, and the boards on which adhesive is applied with the frame method are placed on the subbasement profile and adhered to the wall.
    10. Adhesive mortar is applied by the frame method along the edges of the surfaces to be adhered to the thermal insulation boards, and it is adhered to the wall by applying point adhesive mortar in the middle of the boards and with a syntax method whose ideality is accepted. Mortars overflowing from the edges are strictly cleaned in order to prevent the formation of thermal bridges while the boards are attached to the wall.
    11. After the mortar used in the bonding procedure has dried (average 24 hours), the doweling procedure is carried out with the aim of preventing the effects of wind and turbulence. By international standards, 6 dowels are used per m² in applications.
    12. In order to prevent the risks of separation in the corners due to the effects of water and wind and to obtain smooth corners, the procedure of placing corner profiles is carried out. Dilatation, dropper, sill etc. Materials are applied where necessary.
    13. The first layer of plaster program and reinforcement mesh are placed on the thermal insulation boards in such a way that they are embedded in the plaster. Before the plaster dries, a thicker second layer plaster program should be made.
    14. After the plaster program has completely dried, the cement-based, final layer decorative coating made with a trowel is applied to the surface with a textured effect, and the thermal insulation procedure is terminated by making an acrylic exterior paint program . You have reached the information " How to make sheathing in 14 stages? " above .

    The best thermal insulation materials  are factors such as being durable on the exterior, not easily affected by water and moisture, fire resistance, pressure and tensile strength, vapor diffusion resistance, unit volume weight, plaster adhesion, workability, long life, being economical in terms of sheathing material m2 prices . should be taken into account. As " sheathing companies ", we give a guarantee injacketing package or " jacket jacketing " applications



  • Exterior Thermal Insulation Materials and Technical Specifications
  • What is External Wall Thermal Insulation?, What Does Thermal Insulation Do?
  • What is External Wall Isolation, House Insulation Types
  • What is External Wall Isolation?, What are the Insulation Types?
  • What are the Right and Wrong in Thermal Insulation?




    How to Apply Thermal İnsulation in 14 Articles?

    Metpor Dekor

    How to Apply Sheathing in 14 Articles?

    1. Surface Preparation for Sheathing Application
    2. Basement Profile Placement
    3. Adhesive Metpor Thermal Insulation Boards
    4. Metpor Thermal Insulation Boards Doweling
    5. Metpor Corner Profiles Placement
    6. Metpor Mesh Plaster Application
    7. Metpor Decorative Coating and Exterior Paint
    8. The application surface is cleaned from dust, dirt, oil and moisture. Spilled or swelled areas are cleaned with a wire brush, cracked and broken areas are repaired with filling materials.
    9. It is ensured that the heat insulation boards to be used are placed on the subbasement profile to form a smooth line, and the boards on which adhesive is applied with the frame method are placed on the subbasement profile and adhered to the wall.
    10. Adhesive mortar is applied by the frame method along the edges of the surfaces to be adhered to the thermal insulation boards, and it is adhered to the wall by applying point adhesive mortar in the middle of the boards and with a syntax method whose ideality is accepted. Mortars overflowing from the edges are strictly cleaned in order to prevent the formation of thermal bridges while the boards are attached to the wall.
    11. After the mortar used in the bonding procedure has dried (average 24 hours), the doweling procedure is carried out with the aim of preventing the effects of wind and turbulence. By international standards, 6 dowels are used per m² in applications.
    12. In order to prevent the risks of separation in the corners due to the effects of water and wind and to obtain smooth corners, the procedure of placing corner profiles is carried out. Dilatation, dropper, sill etc. Materials are applied where necessary.
    13. The first layer of plaster program and reinforcement mesh are placed on the thermal insulation boards in such a way that they are embedded in the plaster. Before the plaster dries, a thicker second layer plaster program should be made.
    14. After the plaster program has completely dried, the cement-based, final layer decorative coating made with a trowel is applied to the surface with a textured effect, and the thermal insulation procedure is terminated by making an acrylic exterior paint program . You have reached the information " How to make sheathing in 14 stages? " above .

    The best thermal insulation materials  are factors such as being durable on the exterior, not easily affected by water and moisture, fire resistance, pressure and tensile strength, vapor diffusion resistance, unit volume weight, plaster adhesion, workability, long life, being economical in terms of sheathing material m2 prices . should be taken into account. As " sheathing companies ", we give a guarantee injacketing package or " jacket jacketing " applications

    logo

    Metpor Dekor ile Hayallerinizdeki Binayı Gerçeğe Dönüştürün!

    Estetik, Kalite ve Mükemmellik Sinerjisiyle Buluşuyor! Metpor Dekor, Dış Cephe Kaplama, Söve, Isı yalıtımı ve Mantolama Alanlarında Öncü, Estetik ve Kaliteli Çözümler Sunan Bir Firmadır. #DışCepheKaplama #Söve #IsıYalıtımı #Mantolama #MetporDekor #Estetik #Kalite #Profesyonellik #Mükemmellik. Binalarınız Hayal Gücünüzün Ötesine Geçsin!

    info@metpordekor.com
    Telefon: + 90 216 387 46 64
    FAX: + 90 216 517 84 33
    GSM: + 90 532 697 15 47
    Petrol İş Mahallesi, Kurtuluş Sokak No: 3/B 34862 Kartal/İstanbul

    2005 - 2023 MT Web Team | Metpor Söve & Mantolama Ürünleri - Metpordekor.com

    whatsapp